Peterborough Energy From Waste (EFW)

Peterborough Energy From Waste (EFW)

Description:

Spread across 7,300 sqm, and being built using the latest incineration technology, the site will process up to 85,000 tons of waste per year. The site provides renewable electricity meeting the highest safety and emission standards and enabling Peterborough to save money in the process.

Scope:

As well as M&E design, structural and architectural models, XS CAD incorporated a process model before creating the coordinated model for the project. Using Revit MEP and Navisworks for testing, we provided our output in the form of a 3D MEP model, and installation sheets to the M&E design consultant.

For the latest news and information about our company, projects and new services, please click on one of the links below.

You can also review other news and more detailed articles from XS CAD on the following sites:

URS logo
Autodesk Training Logo
Autodesk Developer Logo
Autodesk Developer Logo