Premium landmark offices and retail space of 38,000 sqm in central Birmingham. Consisting of a roof plant, basement plant, three basement car park levels and twelve floors. All floors featuring a castellated steel beam structure with limited ceiling void.
3D coordination of MEP services (including sprinkler) for the entire building. Working for the main contractor, XS CAD was responsible for coordination across disciplines and for issuing coordinated M&E drawings and record drawings.