
Demonstrating our global business relationships with the building engineering, homebuilding, retail and architectural sectors
Birmingham, UK
Based on 2D design intent drawings and using the latest version of Revit MEP, we created a spatially coordinated 3D model, coordination drawings and installation drawings for a 12,000 sq.m. project consisting of a private hospital and a rehabilitation centre. We used Navisworks for clash detection and to resolve clashes, ensuring ease of installation.
MEP Coordination | MEP Modelling | 2D Design Intent Drawings | Coordinated 3D Model | Coordination Drawings | Installation Drawings | Clash Detection