Demonstrating our global business relationships with the building engineering, homebuilding, retail and architectural sectors
Ystrad Mynach, UK
Working with the lead MEP contractor, we provided spatial 3D coordination for all areas, including a modularised layout for all corridors and the energy centre, all coordinated drawing, all pre-fabricated module drawing and record drawing for a new 265-bed, 322917-sq ft hospital in Wales, with linked buildings/zones and an external energy centre.
Spatial 3D Coordination | Pre-fabricated Module Drawing | Record Drawing